DLR Navigation DLR Navigation
HomeThe firmServicesInsightsContact
Services  /  GROUP 06 OF 11

HSE, Safety & Risk Management

We facilitate pre-hire and pre-mobilisation audits to review Marine and HSE compliance to ensure all respective marine units are maintaining in line with the rules, regulations and standards available to the project management.

Provide comprehensive report to define available deficiencies that may not be acceptable by the required standards.

Comprehensive planning with appraisal through specific HAZID and risk assessments gives the insight needed to develop a package that makes offshore marine projects manageable.

Discuss this scope

Emergency stop on the operating console
Emergency stop on the operating console
Radar and track control on the bridge

RADAR AND TRACK CONTROL ON THE BRIDGE

In detail

Marine assurance audit is how an operator establishes, before commitment, that a unit is fit for the work. Pre-hire and pre-mobilisation audits examine the vessel against the rules, regulations and standards the project is actually held to — SOLAS and MARPOL, the ISM and ISPS Codes, the Maritime Labour Convention, class requirements, and the operator's own acceptance criteria — and produce a report defining any deficiency that would not be acceptable at the required standard.

Assurance without risk assessment is incomplete. Structured HAZID and HAZOP work, supported by quantitative assessment where the exposure justifies it, gives a project the insight to build a workable package rather than discovering constraints in the field. We also carry out incident investigation and root cause analysis, and prepare the emergency response and bridging documentation that reconciles the safety management systems of vessel, contractor and operator into one workable set of arrangements for the duration of the campaign.

WHAT THIS GROUP COVERS

Services in this group

  1. Pre-hire and pre-mobilisation marine assurance audit
  2. HAZID, HAZOP and quantitative risk assessment
  3. ISM, ISPS and MLC compliance review
  4. Incident investigation and root cause analysis
  5. Emergency response planning and bridging documents

Have a campaign to move?

Send the scope and we'll come back with how we'd run it.

Start a discussion